By African Telescope |
Full-scale rehabilitation has commenced on a major stretch of the Great East Road, with engineers upgrading the design to ensure durability and handle rising traffic volumes.
This was disclosed in a statement by the Information and Media Directorate, with spokesperson Henry Kapata providing details of the ongoing works.
The project covers the section between Kadenya Road and the Kenneth Kaunda International Airport roundabout, a critical corridor linking Lusaka to the country’s main international gateway.
According to the statement, geotechnical investigations revealed that the existing subgrade was too weak to support the new pavement structure, necessitating a redesign.
Engineers have since removed the unsuitable material and are replacing it with rock fill, which will be overlaid with three engineered layers of crushed stone to create a stronger and more durable base.
Kapata was quoted as saying, “The upgrade from gravel to crushed stone is aimed at enhancing durability, reducing maintenance costs and ensuring long-term value for money on this critical road infrastructure.”
The statement added that the initial plan to use gravel had been upgraded to crushed stone throughout the stretch to improve longevity and performance.
Work on the project is currently about three percent complete, three weeks after commencement, with plans to deploy two construction teams simultaneously in the coming weeks to accelerate progress.
The government said the rehabilitation is expected to improve traffic flow, road safety and overall connectivity along the busy route serving both local commuters and international travelers.
African Telescope Independent Journalism. African Perspectives